INSTALLATION INSTRUCTIONS
Model #SRS
For Domed Skylights
Click here to view
in Word format

(877) 723-3766 phone
(610) 539-1630 fax


Skylight Screen Installation

Skylight Screen Installation

Safety First!  Personal Fall Protection must be worn during installation of our OSHA compliant Saf-T-Screen skylight screens

IMPORTANT NOTES: 

Optional:  at an additional cost, pads can be provided for under the corners of the skylight screens, Model SRS.  Please contact Safety Rail Source for details.

Tools Required:
variable torque cordless drill, 5/16” driver bit, Phillip’s head screw driver.

Instructions for Model SRS up to 48" in Length (see below for Model SRS Larger Than 48" in Length):

1. Remove ballast and other debris from the roof at the skylight edges.

2. Place screen over skylight, screen base must be resting directly on the roof surface.  If required by roof manufacturer, install optional pads under corners of skylight screen.

3. Start installation on one side of the skylight screen.  Install stainless steel clips onto the screen’s vertical grid wires aligning the clips to the middle of the metal skylight frame.  Clips must be placed every 12” or every 3 skylight grid sections.  Fasten stainless steel grid clips into metal skylight frame using self tapping screws supplied with kit.  BE CAREFUL NOT TO STRIP THE SKYLIGHT FRAME BY OVER TIGHTENING THE SELF TAPPING SCREWS.

4. Move to the other side of the skylight and repeat step 3 above.  Note:  the skylight screen is slightly oversized and will need to be squeezed into the skylight curb to make the attachment.  It’s that simple, you have completed the installation!

Instructions for Model SRS Larger Than 48" in Length:

Each skylight will require 2 or more skylight screens butted together.  Install screens as above, butting screens against each other.  When screens have been fastened to the skylight as in 3 above, use hose clamps provided to attach screens to each other where the screens butt.